•  83
    Operational Safety Risk Assessment for the Water Channels of the South-to-North Water Diversion Project Based on TODIM-FMEA
    with Li Ji, Feng Li, Hairui Li, Qingguo Sun, Zhihong Li, Hongmei Yan, Wei Guan, Lunyan Wang, and Ying Ma
    Complexity 2020 1-15. 2020.
    The South-to-North Water Diversion Project consists of long-distance water delivery channels and a complicated geological environment along the way. To deal with the operation safety of the water conveyance channels in the middle route of the South-to-North Water Diversion Project, this study analyzes six failure modes: structural cracks, poor water delivery during ice periods, instability of canal slopes, material aging, abnormal leakage, and foundation defects. Based on FMEA, a multigranularit…Read more
  •  89
    Existing methods for evaluating manufacturing process chain complexity consider the number of machines, state of machines, number of parts, operation time, and processing sequence of parts. However, such evaluation methods ignore human factors. To consider human factors, human cognitive decision-making process factors are considered in the complexity evaluation of production processes. Accordingly, a new objective evaluation method of the human factor complexity is proposed. In the proposed meth…Read more
  •  234
    A key challenge in the management of the public-private partnership project is to understand the critical factors for sustainability performance as well as their complex interaction. Majority of existing studies focus on identifying general factors without consideration of specific context of individual sector. To bridge the gap, unique characteristics of water PPP projects are taken into consideration in this study where the relationship among critical factors to achieve sustainable performance…Read more